"https://www.nasa.gov/specials/artemis-i/","08-29-2022 12:00:00" "https://www.nasa.gov/specials/artemis-i-press-kit/","08-29-2022 12:00:00" "ARTEMIS SLS-1 LC-39B","08-29-2022 12:00:00" "--- EVENT TABLE -------","08-29-2022 12:00:00" "--- EVENT WIN -----------------------","08-29-2022 12:00:00" "dur: 38d23h49m 05.11.22","08-29-2022 12:00:00" "1st attempt 29.08. 13:53 hold and scrupped","08-29-2022 14:35:00" "2nd attempt 03.09. 14:-- hold and scrupped","09-03-2022 20:17:00" "3nd attempt 27.09. 17:37 w/off: Ian","09-25-2022 12:00:00" "countdown begins","-01/22:40:00" "Fill water Sound Suppr System","-01/22:00:00" "(LO2)/(LH2) Sys Prep for Veh Loading","-01/22:00:00" "Orion Scft powered up if not Call to Stations (CTS)","-01/18:00:00" "The interim (ICPS) is Powered-up","-01/14:00:00" "Final prep of RS-25 engines","-01/12:20:00" "Core stage is powered up","-01/10:00:00" "Core stage composite overwrapped pressure vessel (COPV) Pressurization","-01/07:00:00" "Charge Orion Flt BTRYs to 100%","-01/06:00:00" "Charge Core stage Flt BTRYs","-01/03:00:00" "The ICPS is powered-up for LNH","-00/18:30:00" "All non-essential personnel evacuation","-00/12:00:00" "GND LNH Sequencer (GLS) Activation","-00/11:15:00" "Air-to-gaseous nitrogen (GN2) Changeover for vehicle cavity inerting","-00/10:45:00" "Built-in countdown hold begins","-00/09:40:00" "Launch team: WX and tanking briefing","-00/09:40:00" "GO or NO-GO to begin tanking the rocket","-00/08:40:00" "Core Stage LO2 transfer line chilldown","-00/08:15:00" "Core stage LO2 main prop sys (MPS) chilldown","-00/08:00:00" "Core stage LO2 slow fill","-00/07:20:00" "Core Stage LH2 chilldown","-00/07:15:00" "Core Stage LO2 fast fill","-00/07:05:00" "Core Stage LH2 slow fill start","-00/07:05:00" "Core Stage LH2 fast fill","-00/06:15:00" "Core Stage LH2 topping","-00/05:05:00" "END Core Stage LH2 topping","-00/05:00:00" "Core Stage LH2 replenish","-00/05:00:00" "ICPS LH2 (GSE) and tank chilldown","-00/04:45:00" "ICPS LH2 fast fill start","-00/04:30:00" "Orion comm sys activated (RF to Mission Control)","-00/04:20:00" "Core stage LO2 topping","-00/04:15:00" "Core Stage LO2 replenish","-00/03:55:00" "ICPS L02 MPS chilldown","-00/03:55:00" "ICPS L02 fast fill","-00/03:45:00" "ICPS LH2 validation and leak test","-00/03:30:00" "ICPS LH2 tank topping start","-00/03:15:00" "ICPS/SLS telemetry data verified with Mission Control and SLS Engineering Support Center","-00/02:55:00" "ICPS LO2 validation and leak test","-00/02:55:00" "ICPS LH2 replenish","-00/02:50:00" "ICPS LO2 topping","-00/02:30:00" "ICPS LO2 replenish","-00/02:10:00" "Final NASA Test Dir briefing is held","-00/00:50:00" "Built in 30-minute c/dwn hold begins","-00/00:40:00" "LNH DIR polls the team to ensure they are GO for launch","-00/00:15:00" "GND LNH Sequencer (GLS) init terminal count","-00/00:10:00" "GLS GO for Core stage tank press","-00/00:06:00" "Orion ascent pyros are armed","-00/00:06:00" "Orion set to int power","-00/00:06:00" "Core Stage LH2 terminate replenish","-00/00:05:57" "GLS is GO for flt term system (FTS) arm ","-00/00:05:00" "GLS is GO for LH2 high flow bleed check","-00/00:04:40" "GLS is GO for core stage aux power unit (APU) start","-00/00:04:00" "Core Stage APU starts","-00/00:04:00" "Core stage L02 term replenish","-00/00:04:00" "ICPS LO2 terminate replenish","-00/00:03:30" "GLS is GO for purge sequence 4","-00/00:03:10" "ICPS switches to int BATT power","-00/00:01:56" "Core stage switches to int power","-00/00:01:30" "ICPS enters terminal c/dwn mode","-00/00:01:20" "ICPS LH2 term replenish","-00/00:00:50" "GLS sends Go for auto lnh sequ command","-00/00:00:33" "Core stage Flt Cmptr to auto LNHg sequencer","-00/00:00:30" "Hydrogen burn off igniters initiated","-00/00:00:12" "GLS sends Core stage Engine start","-00/00:00:10" "RS-25 Engines startup","-00/00:00:07" "Booster IGN, Umbilical sep","-00/00:00:00" "***LIFT OFF ARTEMIS 1*** LC-39B","-00/00:00:00" "TOWER CLEAR INIT PITCH/ROLL","+00/00:00:07" "MAX Q","+00/00:01:10" "SRB Separation","+00/00:02:12" "SM Fairing Jettison","+00/00:03:13" "LAS Jettison","+00/00:03:30" "SRB Atlantic Sp/dwn","+00/00:05:24" "Core stage MECO cmd","+00/00:08:04" "Core Stage/ICPS Sep","+00/00:08:16" "Core Stage MECO","+00/00:08:20" "Orion Solar Array Wing Deploy","+00/00:18:20" "END Orion Solar Array Wing Deploy","+00/00:30:20" "ICPS Perigee Raise burn","+00/00:51:00" "End ICPS Perigee Raise burn","+00/00:51:22" "ICPS TLI burn","+00/01:37:00" "Trans-lunar injection","+00/01:38:03" "17 min, 59 sec burn","+00/01:38:03" "Core Stage Pacific Sp/dwn","+00/01:46:00" "End ICPS TLI burn","+00/01:55:00" "ICPS/ORION Separation","+00/02:06:10" "Upper Stage Sep Burn","+00/02:07:31" "ICPS Disposal Burn","+00/03:30:10" "Outbound Trajectory Correction-1 burn","+00/07:56:05" "First service module burn","+00/07:56:05" "FD 2-5 - Outbound transit","+02/00:00:00" "FD 6-9 - Transit to Distant Retrograde Orbit (DRO) around the Moon","+06/00:00:00" "FD 10 DRO Insertion (8:54 a.m.)","+10/00:00:00" "FD 11 Orion passes Apollo 13 Record","+11/00:00:00" "FD 24 DRO Departure (burn 2:52 a.m.)","+24/00:00:00" "FD 26 Max distance from Earth","+26/00:00:00" "FD 35 Return Flyby (burn 12:06 a.m.), Second Closest Approach (~500 miles)","+35/04:03:00" "FD 38 Entry & Splash down","+38/23:49:00"